Portrait of Dr. Tongdan Jin

Dr. Tongdan Jin

  • Professor at Ingram School of Engineering, College of Science & Engineering

Scholarly and Creative Works

2025

  • Fernandez Gil, A., Dong, W., & Jin, T. (n.d.). Queueing Strategic Planning for Electric Aircraft Battery Swap and Mega-charging under Time Constraints. Retrieved from https://www.iise.org/Annual/
  • Najdawi, F. Z. H., Zhu, C., & Jin, T. (2025). Cost and Availability Optimization for Electric Vehicle Charging Infrastructure via Redundancy-Spares-Repair Allocation. Quality and Reliability Engineering International.

2024

  • Fernandez, A. G., Dong, W., & Jin, T. (n.d.). Queueing Strategic Planning for Electric Aircraft Battery Swap and Mega-charging under Time Constraints.
  • Jin, T., Mora Casallas, V., Saha, J., Abbasi, A., & Londa, M. (2024). Planning for net-zero electric vehicle charging infrastructure in Texas through 2040 (pp. 1–6). Institute of Industrial and Systems Engineers.
  • Xiao, B., You, B. H., & Jin, T. (2024). Computational Analysis of Selective Laser Sintering of Inconel 625. Frontiers in Heat and Mass Transfer, 22(2), 417–432.
  • Jin, T., & Sun, F. (2024). Integrating virtual power plants for sustainable supply chain operations in production-climate nexus. Journal of Industrial and Production Engineering, 41(8), 716–732.
  • Jin, T. (2024). Allocating redundancy, maintenance and spare parts for Minning system cost under distributed repairs. Frontiers of Engineering Management, 11(1), 1–19.

2023

  • Li, H., Jin, T., & Zhu, E. (2023). Locating and allocating warehouse facilities and prosumer microgrid in transactive energy paradigm (pp. 410–415). IEEE. https://doi.org/DOI: 10.1109/SEGRE58867.2023.00071
  • Xiao, B., You, B. H., & Jin, T. (2023). Thermal-Fluid Behaviors and Morphology Evolution of Molten Pool During Selective Laser Sintering of Inconel 625.
  • Jin, T., Zhu, C., & Xiao, B. (2023). Cost-Availability Analysis for Redundant Systems with Spares Inventory and Emergency Repair.
  • Jin, T., Zhu, E., & Xiao, B. (2023). [Cost-availability analysis for redundant systems with spares inventory and emergency repair.
  • Somvanshi, S., Zhu, C., Ikehata, K., Valles Molina, D., & Jin, T. (2023). Wind Speed Forecasting for Designing Sustainable Wastewater Treatment Plants (pp. 0844–0850). IEEE. https://doi.org/10.1109/CCWC57344.2023.10099313
  • Somvanshi, S., Fainman, E., Ikehata, keisuke, Valles, D., & Jin, T. (2023). Wind Speed Forecasting for Designing Sustainable Wastewater Treatment Plants. Palo Alto. https://doi.org/10.1109/CCWC57344.2023.10099313
  • Jin, T. (2023). Bridging reliability and operations management for superior system availability: Challenges and opportunities. Frontier of Engineering Management, 10, 391–405. https://doi.org/doi.org/10.1007/s42524-022-0206-4
  • *Lin, H., Jin, T., & Novoa Ramirez, C. M. (2023). Facility and Microgrid Location-Allocation for Integrated Supply Chain and Transactive Energy Operations. Applied Mathematical Modeling, 119, 119–136.

2022

  • Jin, T., & Prabha, undefined S. (2022). Planning resilient virtual power plants for multi-site enterprise systems with thermal cogeneration. IEEE.
  • Jin, T. (2022). Bridging reliability and operations management for new product introduction in nonstationary conditions.
  • Zhu, C., Jin, T., & Keisuke, I. (2022). A Comparative Study of Machine Learning Algorithms for Long-term Daily Water Usage Forecasting.
  • **Islam, S. R., Novoa Ramirez, C. M., & Jin, T. (2022). Multi-Facility Aggregate Production Planning with Prosumer Microgrid: A Two-Stage Stochastic Program. Journal of Cleaner Production, 367, 1–13. https://doi.org/10.1016/j.jclepro.2022.132911
  • Jin, T., Xiang, Y., Qin, J., & Subramanyam, V. (2022). Some New Advances in Modeling for Performance-Based Maintenance Services. In Multicriteria Decision Models and Optimization for Risk, Reliability, and Maintenance Decision Analysis – Recent Advances (p. pages 459-486). Springer. Retrieved from https://link.springer.com/chapter/10.1007/978-3-030-89647-8_22
  • Jin, T., & Sun, F. (2022). A hybrid approach to multi-step, short-term wind speed forecasting using correlated features. Renewable Energy, 186, 742–754.
  • Jin, T., Li, H., & Kumar, S. (2022). Supply chain design for transactive energy operations in the nexus of manufacturing, microgrid and climate. Journal of the Operational Research Society. https://doi.org/https://doi.org/10.1080/01605682.2022.2035273

2021

  • Jin, T., & Novoa, C. M. (2021). NSF - Project Outcomes Report. Retrieved from www.research.gov
  • Jin, T., Li, H., & Sun, F. (2021). System availability considering redundancy, maintenance and spare parts with dual repair processes (pp. 590–595). Hoboken, New Jersey, United States: IISE Conference. Retrieved from https://www.wiley.com/en-us/Reliability+Engineering+and+Services-p-9781119167013
  • **Islam, S., Novoa, C. M., & Jin, T. (2021). A Two-Stage Stochastic Aggregate Production Planning Model with Renewable Energy Prosumers. In Proceedings of the 2021 Institute of Industrial and Systems Engineers (IISE) Annual Conference & Expo (pp. 223–228).
  • Zhang, J., Bai, L., & Jin, T. (2021). Joint planning for battery swap and supercharging networks with priority service queues. International Journal of Production Economics, 233, p108009. Retrieved from https://doi.org/10.1016/j.ijpe.2020.108009
  • Du, Y., Si, S., Cai, Z., & Jin, T. (2021). Bayesian importance measures for network edges under saturated Lagrangian Poisson failures. IEEE Transactions on Reliability, 70(1), 110–120.

2020

  • jin, tongdan, Taboada, H., & Esperitu, J. (2020). Variance of reliability estimate for k-out-of-n systems with cold standby units. Hoboken, New Jersey, United States: IEEE.
  • **Runsewe, T., Novoa Ramirez, C. M., & Jin, T. (2020). Stochastic Model for Planning Distributed Wind Generation using Climate Analytics. In Proceedings of the 2019 Institute of Industrial and Systems Engineers (IISE) Annual Conference & Expo (pp. 1775–1760).
  • Wang, H., & jin, tongdan. (2020). Prevention and survivability for power distribution resilience: A multi-criteria renewables expansion model. IEEE Access, 8. Retrieved from https://www.wiley.com/en-us/Reliability+Engineering+and+Services-p-9781119167013
  • **Subramanayan, V., Jin, T., & Novoa Ramirez, C. M. (2020). Sizing a Renewable Microgrid for Flow Shop Manufacturing using Climate Analytics. Journal of Cleaner Production, 252, 1–15.
  • Duarte, J. L., Fan, N., & jin, tongdan. (2020). Multi-process production scheduling with variable renewable integration and demand response. European Journal of Operational Research, 251(1).
  • Li, B., Chen, H., & Jin, T. (2020). Support Vector Regression for Optimal Robotic Force Control Assembly. J. Manuf. Sci. Eng. https://doi.org/https://doi.org/10.1115/1.4045446

2019

  • Zhu, Z., Xiang, Y., & Jin, T. (2019). A proactive remanufacturing planning model for enhancing environmental sustainability.
  • Jin, T., Huang, Q., Chen, X., & Xiang, Y. (2019). Semiconductor process variation analysis using implicit differentiation considering cross-layer correlations.
  • **Pham, A., Jin, T., Novoa Ramirez, C. M., & Qin, J. (2019). A Multi-Site Production and Microgrid Planning Model for Net-Zero Energy Operations. International Journal of Production Economics, 218, 260–274.
  • Jin, T. (2019). Reliability Engineering and Services. Hoboken, New Jersey, USA: John Wiley & Sons. Retrieved from https://www.wiley.com/en-us/Reliability+Engineering+and+Services-p-9781119167013

2018

  • Jin, T., Mai, N., Ding, Y., Vo, L., & Dawud, R. (2018). Planning for distribution resilience under variable generation: Prevention, surviving and recovery. In 2018 IEEE Annual Green Technologies Conference.
  • **Pham, A., Jin, T., Novoa Ramirez, C. M., & Temponi, C. C. (2018). A Prosumerism Approach to Production-Inventory Planning under Bi-directional Energy Flow. In International Conference on Information Systems, Logistics and Supply Chain (ILS 2018) (pp. 1–8).
  • Zhang, X., Kang, J., Bajrić, R., & Jin, T. (2018). Gearbox Fault Diagnosis based on Fast Empirical Mode Decomposition and Correlated Kurtosis. In Engineering Asset Management (pp. 351–362). Gewerbestrasse 11, 6330 Cham, Switzerland: Spinger.
  • Shang, L., Si, S., Sun, S., & Jin, T. (2018). Optimal warranty design and postwarranty maintenance for products under inverse Gaussian degradation. IISE Transactions, 50(10), 913–927.

2017

  • Jin, T., Taboada, H., Espiritu, J., & Liao, H. (2017). Allocation of reliability-redundancy and spares inventory under Poisson fleet expansion. IISE Transactions, 49(7), 7373.
  • Jin, T., Xiang, Y., & Taboada, H. (2017). Contracting for system availability under fleet expansion: component redundancy vs. spare parts inventory. IEEE.
  • Zhang, J., Bai, L., & Jin, T. (2017). A location-inventory model for deploying battery swapping and supercharge stations for electric vehicles. IISE.
  • Li, B., Tian, Y., Chen, H. (Fred), & Jin, T. (2017). Toward net-zero carbon manufacturing operations: An onsite renewables solution. Journal of the Operational Research Society, 68(3), 308.
  • Golari, M., Fan, N., & Jin, T. (2017). Multistage stochastic optimization for production-inventory planning with intermittent renewable energy. Production and Operations Managemen, 27(3), 409.
  • Wang, H.-K., Li, Y.-F., Huang, H.-Z., & Jin, T. (2017). Near-extreme system condition and near-extreme remaining useful time for a group of products. Reliability Engineering and Systems Safety, 162, 103.
  • Shi, Y., Xiang, Y., Jin, T., & Li, Y. (2017). Joint planning for spare parts inventory and preventive maintenance in a multi-echelon network. International Journal of Inventory Research, 3(3), 263.
  • Pham, A., Jin, T., Novoa, C. M., & Temponi, C. C. (2017). Minimizing levelized cost of distributed wind and solar power: Toward zero carbon supply chain operations. INFORMS.
  • Jin, T., **Pham, A., Novoa Ramirez, C. M., & Temponi, C. C. (2017). A Zero-Carbon Supply Chain Model: Minimising Levelised Cost of Onsite Renewable Generation. Supply Chain Forum: An International Journal, 18(2), 49–59.

2016

  • Jin, T., Zhang, X., Kang, J., & Bajric, R. (2016). Gearbox Fault Diagnosis Based on Fast Empirical Mode Decomposition and Correlated Kurtosis.
  • Jin, T., Pham, A., Novoa, C., & Temponi, C. (2016). A net-zero carbon supply chain model: Minimizing cost of onsite renewable energy.
  • Jin, T., Imani, F., & Bai, L. (2016). Modeling and simulation of hybrid battery swap stations with fast onboard charging.
  • Jin, T., Sun, F., Wu, W., & Tian, Y. (2016). Electric Vehicle Routing for Low Carbon Logistics: The Technology Overview and Modeling.
  • Jin, T., Sun, H., & Mendez, F. (2016). Modeling joint decision on service cost and online retail price subject to customer returns.
  • Jin, T., & Li, Z. (2016). Reliability growth planning for product-service integration.
  • Li, S., Wang, P., Wang, H., & Jin, T. (2016). Design of maintenance outsourcing contracts under fleet expansion.
  • Jin, T., Wu, W., & Tian, Y. (2016). A label-based ant colony system for heterogeneous vehicle routing with time window and backhauls. Applied Soft Computing Journal, 47, 224–234.
  • Jin, T., Mirzahosseinian, H., & Piplani, R. (2016). The impact of fleet size on performance-based incentive management. Journal of the Operational Research Society, 67(1), 165–175.
  • Jin, T., Yu, Y., Zhong, C., & Wang, C. (2016). A multi-agent based design of bidding mechanism for transmission loss reduction. International Journal of Electrical Power and Energy Systems, 78(6), 846–856.

2015

  • Santana- Viera, V., Jimenez, J. A., Jin, T., & Espiritu, J. (2015). Implementing factory demand response with on-site renewable energy: A design-of-experiment approach. International Journal of Production Research – Special Issue on Energy-Aware Manufacturing Operations, 53, 7034–7048.
  • Santana-Viera, V., Jimenez, J., Jin, T., & Espiritu, J. (2015). Implementing factory demand response via onsite renewable energy: a design-of-experiment approach. International Journal of Production Research, 53, 7034–7048.
  • Jin, T., Yu, Y., & Elsayed, E. (2015). Reliability and quality control for distributed wind-solar energy integration: A multi-criteria approach. IIE Transactions, 47, 1122–1138.
  • Jin, T., Tian, Z., & Xie, M. (2015). A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting. International Journal of Production Economics, 31, 31–43.
  • Jin, T., Zhang, X., Li, Z., & Kang, J. (2015). Service parts demand under variable fleet: A big perception on installation data (pp. 1–6).
  • Kang, J., Zhang, X., & Jin, T. (2015). Tracking gearbox degradation based on stable distribution parameters: A case study (pp. 1–6).
  • Sun, F., Jin, T., & Ding, Y. (2015). Modeling aggregate fleet renewals with uncertain system installation times (pp. 1–6).
  • Jin, T., Golari, M., & Fan, N. (2015). Multi-period production-inventory decision under integration of renewable energy sources (pp. 1–8).
  • Jin, T., Sun, F., Coit, D., & Ding, Y. (2015). Increasing energy reliability and power quality via intermittent onsite generation (pp. 1–8).
  • Snead, M., Holt, D., Mullen, M., Londa, M., & Jin, T. (2015). Big data intelligence for eco-friendly bus routing: A case study (pp. 1–8).
  • Chester, C., Montoya, D., Flores, J., Jin, T., & Jimenez, J. (2015). An overview on electric transportation and its role in manufacturing demand responses (pp. 1–8).
  • Jin, T., Xie, W., Liao, H., & Otieno, W. (2015). System availability analysis under redundancy sharing of standby components (pp. 1–6).
  • Jin, T. (2015). Optimal balance between energy and performance in hybrid computing applications.

2014

  • Jin, T., Kang, C., & Chen, H. (2014). Integrating advance demand information in smart grid supply chains. In D. Bakken (Ed.), Smart Grids: Clouds, Communications, Open Source and Automations (pp. 251–274). CRC Press.
  • Jin, T., Liao, H., Taboada, H., Jimenez, J. A., & Sun, F. (2014). Integration of reliability, service and renewables for sustainable manufacturing initiatives (pp. 1–10).
  • Xie, W., Liao, H., & Jin, T. (2014). Maximizing system availability through joint decision on redundancy allocation and spares inventory. European Journal of Operational Research, 237, 164–176.
  • Chen, Y., Zhang, G., Jin, T., Wu, S., & Peng, B. (2014). Quantitative modelling of electricity consumption using computational intelligence aided design. Journal of Cleaner Production, 69, 143–152.
  • Zhang, X., Kang, J., & Jin, T. (2014). Degradation modeling and maintenance decision using Bayesian brief network. IEEE Transactions on Reliability, 63, 620–633.
  • Xiang, Y., Cassady, R., Jin, T., & Zhang, C. (2014). Joint production and maintenance planning with machine deterioration and random yield. International Journal of Production Research, 52, 1644–1657.
  • Abdulsalam, S., Lakomski, D., Gu, Q., Jin, T., & Zong, Z. (2014). Program energy efficiency: the impact of language, compiler and implementation choices (pp. 1–10).
  • Li, B., Chen, H., & Jin, T. (2014). Industrial robotic assembly process modeling using support vector regression (pp. 4334–4339).
  • Li, B., Cheng, H., Chen, H., & Jin, T. (2014). Modeling complex robotic assembly process using Gaussian process regression (pp. 456–461).
  • Farris, J., Li, B., Jin, T., & Chen, H. (2014). Design of a wireless environmental monitoring system for estimating solar photovoltaics generation (pp. 1–10).
  • Jin, T., Liao, H., Taboada, H., Jimenez, J., & Sun, F. (2014). Integration of reliability, service and renewables for sustainable manufacturing initiatives (pp. 1–10).
  • Jin, T., Sun, F., Taboada, H., & Espiritu, J. (2014). A hybrid approach to Weibull renewal approximation with increasing failure rate (pp. 248–253).

2013

  • Villareal, S., Jimenez, J. A., Jin, T., & Cabrera, M. (2013). Designing a sustainable distributed generation system for semiconductor wafer fabs. IEEE Transactions on Automation Science and Engineering – Special Issue on Automation in Green Manufacturing, 10(1), 16–26.
  • Jin, T., Jimenez, J. A., & Tian, Z. (2013). Managing demand response for manufacturing enterprises via renewable energy integration (pp. 657–662).
  • Jin, T., Yu, Y., & Huang, H.-Z. (2013). A multi-phase decision model for reliability growth considering stochastic latent failures. IEEE Transactions on Systems, Man and Cybernetics, Part A, 43, 958–966.
  • Zhang, C., Zhang, T., Chen, N., & Jin, T. (2013). Reliability modeling and analysis for a novel design of modular converter system of wind turbines. Reliability Engineering and Systems Safety, 111, 86–94.
  • Villarreal, S., Jimenez, J., Jin, T., & Cabrera-Rios, M. (2013). Designing a sustainable and distributed generation system for semiconductor wafer fabs. IEEE Transactions on Automation Science and Engineering, 10, 16–26.
  • Jin, T., Tian, Y., Zhang, C., & Coit, D. (2013). A multi-criteria planning for distributed wind generation under strategic maintenance. IEEE Transactions on Power Delivery, 28, 357–367.
  • Sun, Q., Tang, Y., Feng, J., & Jin, T. (2013). Reliability assessment of metallized film capacitors based on performance degradation test. Quality Engineering and Reliability International, 29, 259–265.
  • Zecena, I., Zong, Z., & Jin, T. (2013). Evaluating the performance and energy efficiency of n-body codes on multi-core CPUs and GPUs (pp. 1–8).
  • Nalajala, N., Chen, H., & Jin, T. (2013). A closed-loop home energy automation system via power provisioning (pp. 423–427).
  • Jin, T., & Zong, Z. (2013). Improving system uptime based on reduced sampling data (pp. 1–6).
  • Barry, J., Medellin, J., Piechota, J., Harris, M., Jin, T., & Perez, E. (2013). Minimizing renewable energy integration cost under reliability and power quality requirements (pp. 1–10).
  • Liao, H., Xie, W., & Jin, T. (2013). Maximization of operational availability via integrated redundancy allocation and spare parts logistics (pp. 1–9).
  • Jin, T., Jimenez, J., & Tian, Z. (2013). Managing demand response for manufacturing enterprises via renewable energy integration (pp. 645–650).
  • Jin, T., Xiang, Y., & Cassady, R. (2013). Understanding operational availability in performance-based logistics and maintenance services (pp. 1–6).
  • Jin, T., Katepalli, K., Taboada, H., & Espiritu, J. (2013). Spare parts decision under reliability growth and warranty repair: A customer perspective (pp. 285–289).
  • Ding, F., Tian, Z., & Jin, T. (2013). Maintenance modeling and optimization for wind turbine systems: A review (pp. 569–575).
  • Santana-Viera, V. A., Wilson, R., Jimenez, J. A., Jin, T., & Mendez, F. (2013). Powering high-tech manufacturing facilities using renewable electricity.
  • Li, B., Chen, H., & Jin, T. (2013). Complex robotic assembly process modeling for performance optimization.
  • Xie, W., Jin, T., & Liao, H. (2013). Allocation of spares inventory and redundant units considering fleet expansion.
  • Xiang, Y., & Jin, T. (2013). Joint optimization of X_bar control chart and preventive maintenance policies: A discrete-time Markov model.
  • Santana-Viera, V., Jimenez, J., & Jin, T. (2013). Using renewable energy to power hi-tech manufacturing facilities: A simulation study.
  • Jimenez, J., Santana-Viera, V., Jin, T., Mendez, F., & Huebinger, T. (2013). Using Renewable Energy to Power Hi-Tech Manufacturing Facilities.
  • Jin, T., & Jimenez, J. (2013). Allocation of distributed energy resources: objectives, models and applications.

2012

  • Sanders, L., Lopez, S., Guzman, G., Jimenez, J. A., & Jin, T. (2012). Simulation of a green wafer fab featuring solar photovoltaic technology and storage system (pp. 1–12).
  • Taboada, H., Xiong, Z., Jin, T., & Jimenez, J. A. (2012). Exploring a solar photovoltaic-based energy solution for green manufacturing industry (pp. 40–45).
  • Zhang, C., Xie, M., & Jin, T. (2012). An improved self-starting cumulative count of conforming chart for monitoring high quality processes under group inspection. International Journal of Production Research, 50, 7026–7043.
  • Feng, J., Sun, Q., & Jin, T. (2012). Storage life prediction for high performance capacitor using multi-phase Wiener degradation model. Communication in Statistics-B: Simulation and Computation, 41, 1317–1335.
  • Jin, T., & Tian, Y. (2012). Optimizing reliability and service parts logistics for a time-varying installed base. European Journal of Operational Research, 218, 152–162.
  • Jin, T., & Wang, P. (2012). Planning performance based contracts considering reliability and uncertain system usage. Journal of the Operational Research Society, 63, 1467–1478.
  • Sanders, L., Lopez, S., Guzman, G., Jin, T., & Jimenez, J. (2012). Simulation of a green wafer fab featuring solar photovoltaic technology and storage system (pp. 1–12).
  • Taboada, H., Xiong, Z., Jin, T., & Jimenez, J. (2012). Exploring a solar photovoltaic-based energy solution for a green manufacturing environment (pp. 40–45).
  • Zecena, I., Zong, Z., Ge, R., Jin, T., Chen, Z., & Qiu, M. (2012). Energy consumption analysis of parallel sorting algorithms running on multicore systems (pp. 1–6).
  • Jin, T., Tian, Z., Huerta, M., & Piechota, J. (2012). Minimizing levelized cost of wind energy by coordinating maintenance policy and spares provisioning (pp. 1022–1027).
  • Jin, T., Ding, Y., Guo, H., & Nalajala, N. (2012). Managing wind turbine reliability and maintenance under performance based contract (pp. 1–6).
  • Espiritu, J., Sung, C.-H., Jin, T., & Huang, H.-Z. (2012). Contracting for performance-based maintenance service under profit maximization (pp. 335–339).
  • Mai, N., Dawud, R., & Jin, T. (2012). Striving for operational availability: investing in reliability or maintenance logistics?
  • Jin, T., & Novoa, C. (2012). A multi-criteria and multi-year planning for distributed generation with renewable power.
  • Jin, T. (2012). Performance-based maintenance and logistics service: parts availability or operational availability?
  • Jin, T., Tian, Y., Zhang, C. W., & Coit, D. W. (2012). A multi-criteria approach to distributed generation planning with variable power.
  • Jin, T., & Nalajala, N. (2012). Reliability and cost assessment of energy system with wind and solar cogeneration.
  • Huerta, M., Piechotta, J., & Jin, T. (2012). Wind turbine reliability and lifecycle cost analysis for top three manufacturers.
  • Jin, T. (2012). Demystifying system operational availability in performance-based logistics contracts. PHALANX, 35–37.

2011

  • Novoa Ramirez, C. M., & Jin, T. (2011). Reliability Centered Planning for Distributed Generation Considering Wind Power Volatility. Electric Power Systems Research, 81(8), 1654–1661.
  • Miller, L., Bradley, A., Tish, A., Jin, T., Jimenez, J. A., & Wright, R. (2011). Simulating conveyor-based AMHS layout configurations in small wafer lot manufacturing environments (pp. 1939–1947).
  • Jin, T., Nalajala, N., & Jimenez, J. A. (2011). A multi-criteria approach to performance-based maintenance with variable system fleet (pp. 909–914).
  • Jin, T., & Yadav, O. (2011). Reliability growth planning for electronics design under distributed manufacturing paradigm. International Journal of Collaborative Enterprise, 2, 162–183.
  • Novoa, C., & Jin, T. (2011). Reliability centered planning for distributed generation considering wind power volatilities. Electronic Power Systems Research, 81, 1654–1661.
  • Guo, H., Jin, T., & Mettas, A. (2011). Designing reliability demonstration test for one-shot systems under zero component failures. IEEE Transactions on Reliability, 60, 286–294.
  • Jin, T., & Yu, Y. (2011). Online virtual electricity provisioning system and its preliminary design. Automation of Electric Power Systems (in Chinese), 35, 35–40.
  • Jin, T., Janamanchi, B., & Feng, Q. (2011). Reliability deployment in distributed manufacturing chain via closed-loop six sigma methodology. International Journal of Production Economics, 130, 96–103.
  • Yu, Y., & Jin, T. (2011). The return policy model with fuzzy demand and asymmetric information. Applied Soft Computing, 11, 1669–1678.
  • Jin, T. (2011). A hierarchical Markov reliability model for data storage systems with media self-recovery. International Journal of Reliability, Quality and Safety Engineering, 18, 25–41.
  • Tian, Z., Jin, T., Wu, B., & Ding, F. (2011). Condition-based maintenance optimization for wind power generation systems under continuous monitoring. Renewable Energy, 36, 1502–1509.
  • Jin, T., Tian, Z., & Novoa, C. (2011). Managing performance based logistics by balancing reliability and spare parts (pp. 453–458).
  • Nanajala, N., Jin, T., & Xiang, Y. (2011). A lifecycle approach to performance based service optimization for dynamic wind Turbine fleets (pp. 1–8).
  • Jin, T., & Nanajala, N. (2011). An overview of smart grid technology and recent advances in virtual energy provisioning (pp. 1–8).
  • Jin, T., Liu, L., & Kang, C. (2011). Energy management system for smart grid consumers using advance demand information (pp. 300–306).
  • Jin, T., Wang, P., & Sun, Q. (2011). Reliability prognostics based on equipment built-in diagnostic tools (pp. 1–7).
  • Tian, Z., & Jin, T. (2011). Maintenance of wind turbine systems under continuous monitoring (pp. 1–6).
  • Miller, L., Bradley, A., Tish, A., Jin, T., Jimenez, J. A., & Wright, R. (2011). Simulating conveyor-based AMHS layout configurations in small wafer lot manufacturing environment (pp. 1–6).
  • Jin, T., Nalajala, N., & Jimenez, J. (2011). A multi-criteria approach for performance based maintenance with variable fleet size (pp. 909–914).
  • Villarreal, S., Jimenez, J. A., Jin, T., & Cabrera-Rios, M. (2011). Modeling, analysis and integration of distributed energy systems in semiconductor wafer fabs.
  • Jin, T., Taboada, H., Espiritu, J. F., & Nalajala, N. (2011). Reliability and cost assessment of solar Photovoltaic based microgrid systems.
  • Jin, T., & Sun, C.-H. (2011). A multi-criteria approach to performance based contract for a variable system fleet.
  • Jin, T., Chen, H., & Kang, C. (2011). Integrating consumer advance demand information in smart grid management system.
  • Jin, T., & Tian, Z. (2011). Electronics prognostics under non-stationary Gaussian degradations.

2010

  • Jin, T., & Kilari, M. (2010). An integrated reliability management system for faster time-to-market electronic products. In A. Kamrani & M. Azimi (Eds.), Systems Engineering (pp. 209–234). CRC Press.
  • Jin, T., & Jimenez, J. A. (2010). Review on planning and automation technologies for distributed generation systems (pp. 269–274).
  • Jin, T., & Mechehoul, M. (2010). Ordering electricity via Internet and its potentials for smart grid systems. IEEE Transactions on Smart Grid, 1, 302–310.
  • Jin, T., & Mechehoul, M. (2010). Minimize production loss in device testing via condition based equipment maintenance. IEEE Transactions on Automation Science & Engineering, 7, 958–963.
  • Granado, J. A., & Jin, T. (2010). Spares provisioning for system maintenance under reliability growth-a case study. Reliability Review, 30, 4–16.
  • Jin, T., Liao, H., & Kilari, M. (2010). Reliability growth modeling for in-service systems considering latent failure modes. Microelectronics Reliability, 50, 324–331.
  • Balaji Janamanchi, & Jin, T. (2010). Reliability growth vs. HASS cost for product manufacturing with fast-to-market requirement. International Journal of Productivity and Quality Management, 5, 152–170.
  • Bachnak, R., Goonatilake, R., Jin, T., & Belkhouche, F. (2010). A Glimpse of an effective cohort program for undergraduate students to promote engineering. International Journal of Engineering Studies, 2, 59–66.
  • Jin, T., & Gonigunta, L. (2010). Approximate Weibull renewal functions under reliability growth using Laplace transforms. Journal of Statistical Computation and Simulation: Part B, 80, 273–285.
  • Jin, T., & Jimenez, J. (2010). A Review on planning and automation for distributed generation systems (pp. 269–274).
  • Jin, T., & Ding, Y. (2010). Lifecycle based reliability growth management for electrics designs (pp. 512–517).
  • Jin, T., & Tian, Z. (2010). Uncertainty analysis for wind energy production with dynamic power curves (pp. 745–750).
  • Wang, P., & Jin, T. (2010). Optimal replacement of safety-critical aircraft parts with utilization uncertainties (pp. 1–6).
  • Jin, T., Mechehoul, M., & Yu, Y. (2010). Reliability and demand management for smart grids via virtual energy provisioning.
  • Granado, J. A., Jin, T., & Zhang, C. W. (2010). Maintenance and spares provisioning for wind turbines with time-varying population.

2009

  • Jin, T., & Ozalp, Y. (2009). Minimizing warranty cost by design for reliability in product development phase. International Journal of Six Sigma and Competitive Advantage, 5, 42–58.
  • Wang, P., & Jin, T. (2009). Parametric uncertainty analysis of complex system reliability by Monte Carlo simulations. International Journal of Performability Engineering, 5, 197–199.
  • Jin, T., & Liao, H. (2009). Spare parts inventory control considering stochastic growth of an installed base. Computers & Industrial Engineering, 56, 452–460.
  • Jin, T., & Gonigunta, L. (2009). Weibull and gamma renewal approximation using generalized exponential functions. Communication in Statistics-B: Simulation and Computation, 38, 154–171.
  • Jin, T., & Kilari, M. (2009). Implicit derivative based yield model considering nano-device process variations.
  • Jin, T., & Mechehoul, M. (2009). Mining diagnostic data for electronic prognostics in complex testing equipment.
  • Yu, Y., & Jin, T. (2009). Return policy of two substitutable products with fuzzy demands (pp. 82–86).
  • Jin, T., & Wang, H. (2009). A multi-objective decision making on reliability growth planning for in-service systems (pp. 4677–4683).
  • Jin, T., & Wang, P. (2009). Some advances in uncertainty analysis of complex system reliability estimations (pp. 447–451).
  • Kilari, M., Huang, Q., & Jin, T. (2009). Six-sigma based performance verification in early development of automatic test equipment (pp. 181–186).
  • Jin, T., & Yu, Y. (2009). Production loss based maintenance with uncertain failure service times (pp. 32–37).
  • Wang, P., & Jin, T. (2009). Complex systems reliability estimation considering uncertain component lifetime distributions (pp. 395–399).

2008

  • Jin, T. (2008). Hierarchical variance decomposition of system reliability with duplicated components. IEEE Transactions on Reliability, 57, 564–573.
  • Jin, T., & Coit, D. (2008). Unbiased variance estimates for system reliability estimate using block decompositions. IEEE Transactions on Reliability, 57, 458–464.
  • Jin, T., Liao, H., & Wang, P. (2008). Risk-free based MTBF optimization for electronic product design considering component and non-component failures. International Journal of Product Development, 5, 93–108.
  • Jin, T., & Janamanchi, B. (2008). Approximating Weibull renewal function using exponential functions for decreasing failure rates.
  • Janamanchi, B., & Jin, T. (2008). Zero inventory or just-about-zero inventory.
  • Liao, H., Wang, P., Jin, T., & Repaka, S. (2008). Spare parts management considering new sales (pp. 502–507).
  • Jin, T., Bendjilali, K., & Belkhouche, F. (2008). Characterizing the Exact Collision Course in the Plane for Mobile Robotics Application. In Novel Algorithms and Techniques In Telecommunications, Automation and Industrial Electronics (pp. 83–88).
  • Jin, T., He, J., & Li, J. (2008). Solar Enegy Paints Lareodo Green. Texas A&M International University. Retrieved from http://texascenter.tamiu.edu/pdf_br/v9/v9-Jin.pdf

2007

  • Jin, T., Belkhouche, F., & Sung, C. (2007). A consolidated approach to minimize semiconductor production loss due to unscheduled ATE downtime (pp. 188–193).
  • Jin, T., & Belkhouche, F. (2007). Inventory optimization for repairable products considering the Increase of MTBF and field Installation (pp. 1500–1505).
  • Jin, T., Liao, H., & Luo, W. (2007). Failure time based reliability growth in product development and manufacturing (pp. 488–493).

2006

  • Jin, T. (2006). HASS or Non-HASS for printed circuit board manufacturing-how to breakeven in MTBF vs. cost.
  • Jin, T., Liao, H., Xiong, Z., & Sung, C. (2006). Computerized reparable inventory management with reliability growth and increased product population (pp. 336–341).

2004

  • Coit, D., Jin, T., & Wattanapongsakorn, N. (2004). System optimization considering component reliability estimation uncertainty: multi-criteria approach. IEEE Transactions on Reliability, 53, 369–380.
  • Ramirez-Marquez, J., Coit, D., & Jin, T. (2004). Test plan allocation to minimize system reliability estimation variability. International Journal of Reliability, Quality and Safety Engineering, 11, 257–272.

2001

  • Jin, T., & Coit, D. (2001). Variance of system reliability estimation with arbitrarily repeated components. IEEE Transactions on Reliability, 50, 409–413.
  • Jin, T., & Coit, D. (2001). Prioritization of system reliability prediction improvements. IEEE Transactions on Reliability, 50, 17–25.

2000

  • Coit, D., & Jin, T. (2000). Gamma distribution parameter estimation for field data with missing times. IIE Transactions, 32, 1161–1166.
  • Jin, T., & Coit, D. (2000). Allocation of Component Test Units to Minimize Reliability Estimation Variation: A Bayesian Approach.