Scholarly and Creative Works
2011
- Wright, R. L. (2011). Simulating conveyor-based amhs layout configurations in small wafer lot manufacturing environments. IEEE. Retrieved from 10.1109/WSC.2011.6147908
2010
- Wright, R. L. (2010). AMHS factors enabling small wafer lot manufacturing in semiconductor wafer fabs. IEEE. Retrieved from 10.1109/WSC.2010.5678953
2008
- Wright, R. L. (2008). High speed semiconductor fab simulation for large, medium and small lot sizes.
- Wright, R. L. (2008). 300 mm Productivity Detractors Mitigation Cost Analysis. IEEE. Retrieved from 10.1109/ASMC.2008.4529042
- Rothe, O., Van Eck, B., Fandel, D., & Wright, R. L. (2008). A Vision for a Next-Generation 300mm Factory. Solid State Technology, 51(10), 24. Retrieved from https://go.gale.com/ps/anonymous?id=GALE%7CA186951809&sid=googleScholar&v=2.1&it=r&linkaccess=abs&issn=0038111X&p=AONE&sw=w
- Fandel, D., & Wright, R. L. (2008). 300mmPrime: Tackling detractors of fab productivity. Semiconductor International, 31(8), 51–56. Retrieved from 300mmPrime: Tackling Detractors of Fab Productivity D FANDEL, R WRIGHT - Semiconductor international, 2008 - Cahners
- Wright, R. L., Zarifoglu, E., Bubela, C., & Preece, J. (2008). Modeling Semiconductor Factories for Equipment and Cycle Time Reduction Opportunities; Part II. Future Fab International, 25, 54–59.
- Wright, R. L., & Bass, E. (2008). Modeling Semiconductor Factories for Equipment and Cycle Time Reduction. Future Fab International, (24), 50–55.
2005
- Ghatalia, A., Adusimilli, K., Dyer, D., Worth, W., Wright, R. L., Naughton, P., … Burnett, S. (2005). Impact of Single-Wafer Clean on Manufacturing Efficiency - Semiconductor Fab Perspective. FabTech. Retrieved from www.fabtech.org/lib/printable/576/
2004
- Wright, R. L. (2004). Comparative factory analysis of standard FOUP capacities. IEEE. Retrieved from 10.1109/WSC.2004.1371551
- Wright, R. L., Hasenbein, J. J., & Sigireddy, S. (2004). Taking a Queue from Simulation, 36(8), 39–43.
2002
- Wright, R. L. (2002). Effects of metrology load port buffering in automated 300 mm factories. IEEE.
2000
- Wright, R. L. (2000). Simulation, modeling for 300mm semiconductor factories. Solid State Technology, (Vol. 43, Issue 10)((Vol. 43, Issue 10)). Retrieved from https://link-gale-com.libproxy.txstate.edu/apps/doc/A66280256/ITBC?u=txshracd2550&sid=bookmark-ITBC&xid=ea25e567
1999
- Wright, R. L., & Cunningham, C. (1999). 300mm Factory Layout and Automated Materials Handling. Solid State Technology, 42(12), 35. Retrieved from https://link-gale-com.libproxy.txstate.edu/apps/doc/A58538771/ITBC?u=txshracd2550&sid=bookmark-ITBC&xid=d1827447
