-
Rothe, O., Van Eck, B., Fandel, D., & Wright, R. L. (2008). A Vision for a Next-Generation 300mm Factory. Solid State Technology, 51(10), 24.
-
Fandel, D., & Wright, R. L. (2008). 300mmPrime: Tackling detractors of fab productivity. Semiconductor International (8th ed., Vol. 31, pp. 51–56). Retrieved from https://api.elsevier.com/content/abstract/scopus_id/47749093172
-
Fandel, D., & Wright, R. L. (2008). 300mm Productivity Detractors-Mitigation Cost Analysis (pp. 222–227). Cambridge, MA: 2008 IEEE/SEMI Advanced Semiconductor Manufacturing Conference.
-
Wright, R. L., Zarifoglu, E., Bubela, C., & Preece, J. (2008). Modeling Semiconductor Factories for Equipment and Cycle Time Reduction Opportunities; Part II. Future Fab International, 25, 54–59.
-
Wright, R. L., & Bass, E. (2008). Modeling Semiconductor Factories for Equipment and Cycle Time Reduction. Future Fab International, (24), 50–55.